{"id":100384,"date":"2023-06-27T11:38:43","date_gmt":"2023-06-27T08:38:43","guid":{"rendered":"https:\/\/realitatearutiera.ro\/?p=100384"},"modified":"2023-06-27T11:38:47","modified_gmt":"2023-06-27T08:38:47","slug":"constructorul-care-va-finaliza-lucrarile-pe-tronsonul-1-al-drumului-expres-craiova-pitesti","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=100384","title":{"rendered":"Constructorul care va finaliza lucr\u0103rile pe tronsonul 1 al drumului expres Craiova-Pite\u015fti"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>Sorin Grindeanu<\/strong>, ministrul Transporturilor, a anun\u021bat cine este constructorul care va finaliza lucr\u0103rile pe tronsonul 1 al drumului expres Craiova-Pite\u015fti, \u00een lungime de 17,7 kilometri.<\/h2>\n\n\n\n<p><strong>Sorin Grindeanu<\/strong>&nbsp;anun\u021b\u0103 c\u0103 o asociere de constructori rom\u00e2ni \u015fi turci va finaliza luc\u0103rile pe&nbsp;<a href=\"https:\/\/www.realitatea.net\/stiri\/actual\/sa-deschis-circulatia-pe-lotul-1-tronsonul-2-al-drumului-expres-craiovapitesti-anuntul-ministrului-grindeanu_6261896073620f6d0d2f7062\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>tronsonul 1 al drumului expres Craiova-Pite\u015fti<\/strong><\/a>.&nbsp;<\/p>\n\n\n\n<p>Dup\u0103 semnarea contractului, acesta va avea la dispozi\u021bie 439,29 milioane de lei, f\u0103r\u0103 TVA, \u015fi un termen de 18 luni pentru finalizarea lucr\u0103rilor.&nbsp;<\/p>\n\n\n\n<p><a href=\"https:\/\/www.realitatea.net\/stiri\/actual\/critici-la-adresa-lui-sorin-grindeanu-la-un-an-si-jumatate-de-mandat-proiectarea-autostrazii-ploiestibrasov-e-blocata-studiul-de-fezabilitate-realizat-5_646103b894b9520f9a6c9582\" target=\"_blank\" rel=\"noreferrer noopener\"><strong>Sorin Grindeanu<\/strong><\/a>&nbsp;a mai anun\u021bat c\u0103 finan\u0163area lucr\u0103rilor \u00eentre Craiova \u015fi Rob\u0103ne\u015fti este asigurat\u0103 din fonduri europene nerambursabile, iar procedurile pentru semnarea contractului vor putea fi demarate peste 10 zile, \u0219i asta dac\u0103 nu vor fi depuse contesta\u0163ii.<\/p>\n\n\n\n<p>Potrivit ministrului Transporturilor, contractul precedent a fost reziliat la sf\u00e2r\u015fitul anului trecut, dup\u0103 ce constructorul italian nu a mai fost capabil s\u0103 continue lucr\u0103rile.<\/p>\n\n\n\n<p>Sursa:realitatea<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Sorin Grindeanu, ministrul Transporturilor, a anun\u021bat cine este constructorul care va finaliza lucr\u0103rile pe tronsonul 1 al drumului expres Craiova-Pite\u015fti,<\/p>\n","protected":false},"author":1,"featured_media":100385,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[6],"tags":[],"class_list":["post-100384","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-social"],"jetpack_featured_media_url":"https:\/\/i1.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2023\/06\/Drum-expres-Craiova-Pitesti1.jpg?fit=850%2C543&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-q76","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/100384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=100384"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/100384\/revisions"}],"predecessor-version":[{"id":100386,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/100384\/revisions\/100386"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/100385"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=100384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=100384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=100384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}