{"id":110945,"date":"2024-05-07T08:45:00","date_gmt":"2024-05-07T05:45:00","guid":{"rendered":"https:\/\/realitatearutiera.ro\/?p=110945"},"modified":"2024-05-07T08:45:00","modified_gmt":"2024-05-07T05:45:00","slug":"transporturi-agabaritice-37","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=110945","title":{"rendered":"TRANSPORTURI AGABARITICE"},"content":{"rendered":"\n<p><strong>Centrul INFOTRAFIC din Inspectoratul General al Poli\u021biei Rom\u00e2ne&nbsp;<\/strong>informeaz\u0103 c\u0103 ast\u0103zi se vor deplasa 8 transporturi agabaritice pe urm\u0103toarele trasee:<\/p>\n\n\n\n<p>&#8211; Giurgiu Pod \u2013 DN 5 \u2013 DN 5B \u2013 DN 6 \u2013 DNCB \u2013 A1 \u2013 DJ 703B, \u00eencep\u00e2nd cu ora 09.00, un transport format din dou\u0103 camioane cu masa de 103, respectiv 117 tone;<\/p>\n\n\n\n<p>&#8211; Cristian, jude\u021bul Sibiu \u2013 DN 1 \u2013 DN 7H \u2013 A1 \u2013 DN 7 \u2013 Vladimirescu, jude\u021bul Arad; \u00eencep\u00e2nd cu ora 20.00, cinci transporturi formate din c\u00e2te un camion cu lungimea de 49 metri \u0219i mase de 92 \u2013 102 tone;<\/p>\n\n\n\n<p>&nbsp;&#8211; Port Olteni\u021ba \u2013 DN 4 \u2013 DNCB \u2013 DN 2 \u2013 DN 1A \u2013 DN 1 \u2013 DN1A; \u00eencep\u00e2nd cu ora 20.00, un transport format dintr-un camion cu \u00een\u0103l\u021bimea de 6,25 metri \u0219i masa de 89,5 tone;<\/p>\n\n\n\n<p>&#8211; Brazi \u2013 DN 1 \u2013 DN 1A \u2013 DN 1B \u2013 DN 2 \u2013 DN 2B \u2013 Buz\u0103u, \u00eencep\u00e2nd cu ora 20.00, un transport format dintr-un camion cu l\u0103\u021bimea de 6,5 metri \u0219i masa de 136,7 tone.<\/p>\n\n\n\n<p>Transporturile vor fi \u00eenso\u021bite pe traseele precizate de echipaje de poli\u021bie rutier\u0103.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Centrul INFOTRAFIC din Inspectoratul General al Poli\u021biei Rom\u00e2ne&nbsp;informeaz\u0103 c\u0103 ast\u0103zi se vor deplasa 8 transporturi agabaritice pe urm\u0103toarele trasee: &#8211;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[1],"tags":[],"class_list":["post-110945","post","type-post","status-publish","format-standard","hentry","category-uncategorized"],"jetpack_featured_media_url":"","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-sRr","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/110945","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=110945"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/110945\/revisions"}],"predecessor-version":[{"id":110948,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/110945\/revisions\/110948"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=110945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=110945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=110945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}