{"id":111967,"date":"2024-06-03T10:43:54","date_gmt":"2024-06-03T07:43:54","guid":{"rendered":"https:\/\/realitatearutiera.ro\/?p=111967"},"modified":"2024-06-03T10:43:56","modified_gmt":"2024-06-03T07:43:56","slug":"cand-se-va-circula-pe-autostrada-intre-bucuresti-si-sibiu","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=111967","title":{"rendered":"C\u00e2nd se va circula pe autostrad\u0103 \u00eentre Bucure\u0219ti \u0219i Sibiu?"},"content":{"rendered":"\n<p>S-a stabilit c\u00e2nd se va circula pe autostrad\u0103, \u00eentre Bucure\u0219ti \u0219i Sibiu. Compania Na\u021bional\u0103 de Drumuri (CNAIR) a precizat c\u0103 deja prima sec\u021biune s-a deschis.<\/p>\n\n\n\n<p>Autostrada Bucure\u0219ti-Pite\u0219ti urmeaz\u0103 s\u0103 fie conectat\u0103 cu autostrada Pite\u0219ti-<a href=\"https:\/\/www.promotor.ro\/stiri-auto\/primul-tronson-din-autostrada-sibiu-pitesti-a-fost-deschis-circulatiei-video-19122152\">Sibiu<\/a>, care acum se construie\u0219te.<\/p>\n\n\n\n<p>Aceasta este una dintre marile investi\u021bii \u00een infrastructur\u0103, fiind a\u0219teptat\u0103 de foarte mul\u021bi \u0219oferi. Pentru c\u0103 acest drum de mare vitez\u0103 va face leg\u0103tura \u00eentre grani\u021ba de Vest a \u021b\u0103rii \u0219i centrul \u0219i Estul Rom\u00e2niei.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00e2nd se va circula pe autostrad\u0103 \u00eentre Bucure\u0219ti \u0219i Sibiu?<\/h2>\n\n\n\n<p>Compania Na\u021bional\u0103 de Drumuri a transmis ProMotor care este stadiul actual al lucr\u0103rilor la&nbsp;<a href=\"https:\/\/www.promotor.ro\/stiri-auto\/primul-tronson-al-a1-sibiu-pitesti-va-fi-inaugurat-anul-acesta-19117036\">autostrada<\/a>&nbsp;Pite\u0219ti-Sibiu.<\/p>\n\n\n\n<p>Aceast\u0103 \u0219osea de mare vitez\u0103 e \u00eemp\u0103r\u021bit\u0103 \u00een 5 sec\u021biuni:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Sibiu \u2013 Boi\u021ba: Deschis circula\u021biei din decembrie 2022.<\/li>\n\n\n\n<li>Boi\u021ba \u2013 Cornetu: \u00cen stadiul de proiectare.<\/li>\n\n\n\n<li>Cornetu \u2013 Tigveni: \u00cen stadiul de proiectare.<\/li>\n\n\n\n<li>Tigveni \u2013 Curtea de Arge\u0219: 32.76% realizat.<\/li>\n\n\n\n<li>Curtea de Arge\u0219 \u2013 Pite\u0219ti: 67.01% realizat.<\/li>\n<\/ol>\n\n\n\n<p>\u201e<strong><em>Este cel mai mare proiect de infrastructur\u0103 rutier\u0103 realizat vreodat\u0103 \u00een Rom\u00e2nia. Sunt zone unde constructorul \u00eent\u00e2lne\u0219te vestigii istorice. De asemenea, trebuie s\u0103pate tunele, \u00een zona montan\u0103. Plus c\u0103 trebuie realizate exproprierile \u0219i defri\u0219ate zonele forestiere pe unde trece drumul. \u00cen prezent, deja s-a deschis prima por\u021biune, \u00eentre Sibiu \u0219i Boi\u021ba, iar lucr\u0103rile avanseaz\u0103 accelerat. Rom\u00e2nii vor putea circula pe autostrad\u0103 \u00eentre Bucure\u0219ti \u0219i Sibiu \u00een 2028, c\u00e2nd e stabilit termenul de finalizare pentru sec\u021biunile 3 \u0219i 4, \u00eentre Cornetu \u0219i Curtea de Arge\u0219<\/em><\/strong>\u201d, a explicat pentru ProMotor purt\u0103torul de cuv\u00e2nt al&nbsp;<a href=\"https:\/\/www.promotor.ro\/stiri-auto\/cum-arata-noile-sisteme-de-parapete-mobile-montate-pe-dn1-cnair-este-unul-dintre-cele-mai-sigure-video-19267062\">CNAIR<\/a>, Alin \u0218erb\u0103nescu.<\/p>\n\n\n\n<p>Cea mai complicat\u0103 por\u021biune este cea din zona Curtea de Arge\u0219-Tigveni-Cornetu.<\/p>\n\n\n\n<p>\u201e<strong><em>Aici se lucreaz\u0103 24\/24h pentru construc\u021bia primului tunel rutier la nivel de autostrad\u0103 de pe acest drum de mare vitez\u0103 pe sub Dealul Momaia din jude\u021bul Arge\u0219. Au fost executa\u021bi \u00een total 1.273 metri de tunel forat pe ambele fire, din care 686 metri de tunel pe firul ie\u0219iri din tunel, sensul Sibiu \u2013 Pite\u0219ti (Tunel Daniela) \u015fi 587 metri de tunel pe firul intr\u0103rii \u00een tunel, sensul Pite\u0219ti \u2013 Sibiu (Tunel Alina).<\/em>&nbsp;Acest tronson reprezint\u0103 prima trecere la nivel de autostrad\u0103 peste Carpa\u021bi<\/strong>\u201d, a mai explicat Alin \u0218erb\u0103nescu.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">C\u00e2t cost\u0103 construirea autostr\u0103zii Pite\u0219ti-Sibiu<\/h2>\n\n\n\n<p>\u00centr-un r\u0103spuns transmis ProMotor, CNAIR a precizat c\u00e2t cost\u0103 fiecare sec\u021biune a&nbsp;<a href=\"https:\/\/www.promotor.ro\/stiri-auto\/2024-unde-sunt-amplasate-radare-fixe-in-romania-cnair-are-peste-100-de-camere-de-rovinieta-19268128\">autostr\u0103zii<\/a>&nbsp;Pite\u0219ti-Sibiu.<\/p>\n\n\n\n<p>Sec\u021biunea 1 Sibiu \u2013 Boi\u021ba (13,17 km):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Antreprenor: PORR Construct SRL;<\/li>\n\n\n\n<li>Valoarea contract: 612,65 milioane de lei, f\u0103r\u0103 TVA.<\/li>\n<\/ul>\n\n\n\n<p>Sec\u021biunea 2 Boi\u021ba \u2013 Cornetu (31,33 km):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Antreprenor: Asocierea Mapa Insaat Ve Ticaret AS \u2013 Cengiz Insaat Sanayi Ve Ticaret AS;<\/li>\n\n\n\n<li>Valoarea contract: 4.25 miliarde de lei, f\u0103r\u0103 TVA;<\/li>\n<\/ul>\n\n\n\n<p>Sec\u021biunea 3 Cornetu \u2013 Tigveni (37,40 km):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Antreprenor: Asocierea Webuild SPA \u2013 Trancrad SRL;<\/li>\n\n\n\n<li>Valoare contract: 5.32 miliarde de lei, f\u0103r\u0103 TVA;<\/li>\n<\/ul>\n\n\n\n<p>Sec\u021biunea 4 Tigveni \u2013 Curtea de Arge\u0219 (9,86 km):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Antreprenor: PORR Construct SRL;<\/li>\n\n\n\n<li>Valoare contract: 1.67 miliarde de lei, f\u0103r\u0103 TVA;<\/li>\n<\/ul>\n\n\n\n<p>Sec\u021biunea 5 Curtea de Arge\u0219 \u2013 Pite\u0219ti (30,35 km)<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Antreprenor: Webuild SPA;<\/li>\n\n\n\n<li>Valoare contract: 1.71 miliarde de lei, f\u0103r\u0103 TVA.<\/li>\n<\/ul>\n\n\n\n<p>A\u0219adar, valoarea total\u0103 a\u00a0<a href=\"https:\/\/www.promotor.ro\/stiri-auto\/exclusiv-cnair-din-2024-va-fi-introdusa-rovinieta-de-1-zi-cat-va-fi-taxa-de-drum-anul-viitor-19237659\">proiectului<\/a>\u00a0dep\u0103\u0219e\u0219te 16 miliarde de lei, cu totul. Banii au fost aloca\u021bi prin Programul Transport (PT) \u0219i Programul Opera\u021bional Infrastructur\u0103 Mare (POIM).<\/p>\n\n\n\n<p>Sursa\/foto:promotor<\/p>\n","protected":false},"excerpt":{"rendered":"<p>S-a stabilit c\u00e2nd se va circula pe autostrad\u0103, \u00eentre Bucure\u0219ti \u0219i Sibiu. Compania Na\u021bional\u0103 de Drumuri (CNAIR) a precizat c\u0103<\/p>\n","protected":false},"author":1,"featured_media":111968,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[82],"tags":[],"class_list":["post-111967","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-auto"],"jetpack_featured_media_url":"https:\/\/realitatearutiera.ro\/wp-content\/uploads\/2024\/06\/https___www.promotor.ro_wp-content_uploads_2024_05_autostrada-bucuresti-sibiu-1024x557-1.webp","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-t7V","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/111967","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=111967"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/111967\/revisions"}],"predecessor-version":[{"id":111969,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/111967\/revisions\/111969"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/111968"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=111967"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=111967"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=111967"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}