{"id":121147,"date":"2025-02-12T11:20:34","date_gmt":"2025-02-12T09:20:34","guid":{"rendered":"https:\/\/realitatearutiera.ro\/?p=121147"},"modified":"2025-02-12T11:20:35","modified_gmt":"2025-02-12T09:20:35","slug":"romania-va-avea-o-noua-autostrada-ce-va-face-legatura-intre-timisoara-si-moravita","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=121147","title":{"rendered":"Rom\u00e2nia va avea o nou\u0103 autostrad\u0103 ce va face\u00a0leg\u0103tura \u00eentre Timi\u0219oara \u0219i Moravi\u021ba"},"content":{"rendered":"\n<p>O nou\u0103 autostrad\u0103 va lega Rom\u00e2nia de Serbia. Botezat\u0103 A9, va costa 3 miliarde de euro \u0219i va face leg\u0103tura \u00eentre Timi\u0219oara \u0219i Moravi\u021ba. Pentru primul tronson, de 36 de kilometri, au fost depuse mai multe oferte de proiectare \u0219i execu\u021bie.<\/p>\n\n\n\n<p>Viitoarea autostrada va avea 73 de kilometri \u015fi va pleca de la Timi\u0219oara p\u00e2n\u0103 la frontiera cu Serbia.<\/p>\n\n\n\n<p>9 oferte au fost depuse deja de firme de construc\u021bii, at\u00e2t din Rom\u00e2nia, c\u00e2t \u0219i din Italia, Turcia, Bulgaria \u0219i Ucraina, pentru prima parte de tronson.<\/p>\n\n\n\n<p>Pe traseul acestui lot se va construi \u015fi un pod peste R\u00e2ul Timi\u0219.<\/p>\n\n\n\n<p>Primul nod rutier va fi la Remetea Mare, unde se va face desc\u0103rcarea din acela\u0219i punct cu autostrada A1 spre drumul na\u021bional 6. Iar alte trei noduri vor fi la Albina la Timi\u0219oara, \u00een partea de sud a ora\u0219ului, dar \u0219i pe drumul na\u021bional 59, la P\u0103dureni.<br><strong><br>Alin \u015eerb\u0103nescu, Compania Na\u0163ional\u0103 de Drumuri:<\/strong>&nbsp;<em>&#8220;La ora actual\u0103, sunt dou\u0103 loturi care sunt scoase \u00een licita\u021bie. Noi estim\u0103m c\u0103 tot procesul de evaluare va dura undeva la patru luni. Dac\u0103 nu vom avea acele faimoase contesta\u021bii. Deci, undeva \u00een vara acestui an, hai toamna anului, ar trebui s\u0103 avem un contract semnat&#8221;.<\/em><\/p>\n\n\n\n<p>Finan\u021barea este asigurat\u0103 cu fonduri europene \u0219i de la bugetul de stat, valoarea total\u0103 fiind de 15 miliarde de lei, adic\u0103 3 miliarde de euro.<\/p>\n\n\n\n<p><strong>Irinel Ionel Scriosteanu, Secretar de Stat Ministerul Transporturilor:<\/strong>&nbsp;<em>\u201d<\/em><em>Undeva \u00een anul 2028 ar trebui s\u0103 fie finalizata \u0219i s\u0103 fie dat\u0103 \u00een trafic\u201d.<br><\/em><strong><br>Ionu\u0163 Ciurea, Asocia\u0163ia Pro Infrastructura:&nbsp;<\/strong><em>&#8220;Nu este o prioritate. Mai ales c\u0103 noi vorbim de multe alte zone, cu un trafic foarte mare \u0219i coridoare mai importante din \u021bara asta. Bra\u0219ovul nu e conectat de capital\u0103, nu e conectat nici de vest, deci avem foarte multe probleme&#8221;.<\/em><\/p>\n\n\n\n<p>La sf\u00e2r\u0219itul anului trecut, Rom\u00e2nia avea 1275 de kilometri de autostr\u0103zi \u0219i drumuri expres.<\/p>\n\n\n\n<p>Video<em> <strong><a href=\"https:\/\/stirileprotv.ro\/stiri\/actualitate\/romania-va-avea-o-noua-autostrada-a9-va-costa-3-miliarde-de-euro-si-va-avea-73-de-kilometri-care-vor-pleca-din-timisoara.html\">aici<\/a><\/strong><\/em><\/p>\n\n\n\n<p>Sursa:stirileprotv<\/p>\n","protected":false},"excerpt":{"rendered":"<p>O nou\u0103 autostrad\u0103 va lega Rom\u00e2nia de Serbia. Botezat\u0103 A9, va costa 3 miliarde de euro \u0219i va face leg\u0103tura<\/p>\n","protected":false},"author":1,"featured_media":121148,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[6],"tags":[],"class_list":["post-121147","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-social"],"jetpack_featured_media_url":"https:\/\/i1.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2025\/02\/62509378.jpg?fit=800%2C450&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-vvZ","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/121147","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=121147"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/121147\/revisions"}],"predecessor-version":[{"id":121149,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/121147\/revisions\/121149"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/121148"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=121147"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=121147"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=121147"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}