{"id":134698,"date":"2026-03-16T11:31:12","date_gmt":"2026-03-16T09:31:12","guid":{"rendered":"https:\/\/realitatearutiera.ro\/?p=134698"},"modified":"2026-03-16T11:31:14","modified_gmt":"2026-03-16T09:31:14","slug":"restrictii-de-trafic-pe-dn-7-ramnicu-valcea-sibiu","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=134698","title":{"rendered":"RESTRIC\u021aII DE TRAFIC PE DN 7 R\u00c2MNICU V\u00c2LCEA &#8211; SIBIU"},"content":{"rendered":"\n<p><strong>Ora:&nbsp;<\/strong>11:15<\/p>\n\n\n\n<p><strong>Centrul INFOTRAFIC din Inspectoratul General al Poli\u021biei Rom\u00e2ne&nbsp;<\/strong>informeaz\u0103 c\u0103 \u00een perioada 17.03.2026 \u2013 15.06.2026, \u00een intervalul orar 08:00 &#8211; 17:30, circula\u021bia rutier\u0103 va fi interzis\u0103 pentru autovehiculele mai mari de 7.5 tone, pe DN 7 R\u00e2mnicu V\u00e2lcea \u2013 Sibiu, tronson kilometric 198+200 \u2013 233+200 de metri, \u00eentre localit\u0103\u021bile C\u0103lim\u0103ne\u0219ti \u0219i C\u00e2inenii Mari, jude\u021bul V\u00e2lcea.<\/p>\n\n\n\n<p>\u00cen cadrul obiectivului se vor realiza lucr\u0103ri de r\u00e2nguire versan\u021bi, dislocare blocuri de roc\u0103, cur\u0103\u021bare taluz drum de material instabil, montare plase ancorate \u0219i plase de protec\u021bie, repara\u021bii co\u0219uri de gabioane degradate \u0219i execu\u021bie sistem de colectare \u0219i dirijare a apei.<\/p>\n\n\n\n<p>Traficul autovehiculelor cu masa total\u0103 maxim\u0103 autorizat\u0103 mai mare de 7.5 tone urmeaz\u0103 a se realiza pe rutele ocolitoare:<\/p>\n\n\n\n<p>&#8211; pentru rela\u021bia Bucure\u0219ti \u2013 Ve\u0219tem \u0219i retur: Bucure\u0219ti \u2192 A 3 \u2192 Ploie\u0219ti&nbsp; \u2192 DN 1A \u2192 Bra\u0219ov \u2192 DN 1 \u2192 Ve\u0219tem \u2013 intersec\u021bie cu DN 7;<\/p>\n\n\n\n<p>&#8211; pentru rela\u021bia Bucure\u0219ti \u2013 A 1 Simeria (N\u0103dlac II\/ Cluj) \u0219i retur: Bucure\u0219ti \u2192 A 1 \u2192 Pite\u0219ti \u2192 DN 7 \u2192 R\u00e2mnicu V\u00e2lcea \u2192 DN 67 \u2192 T\u00e2rgu Jiu \u2192 DN 66 \u2192 Simeria \u2192 Nod Rutier Simeria A1;<\/p>\n\n\n\n<p>Circula\u021bia autovehiculelor mai mici de 7.5 tone va fi restric\u021bionat\u0103 pe sectoarele afectate de lucr\u0103ri, traficul urm\u00e2nd a se desf\u0103\u0219ura alternativ, pe o band\u0103 de circula\u021bie, dirijat cu pilo\u021bi.<\/p>\n\n\n\n<p>\u00cenchiderile pentru realizarea interven\u021biilor de r\u00e2nguire a versan\u021bilor \u0219i dislocare a blocurilor de roc\u0103 se vor efectua \u00een reprize de maximum 30 de minute, \u00een zilele de luni &#8211; vineri, respectiv \u00een reprize de maximum 15 minute s\u00e2mb\u0103ta, care vor alterna cu intervale de deschidere a traficului, \u00een func\u021bie de intensitatea acestuia la momentul execut\u0103rii lucr\u0103rilor, prin mijloace de semnalizare temporar\u0103, precum \u0219i cu asigurarea prezen\u021bei pilo\u021bilor de circula\u021bie la capetele sectoarelor \u00eenchise.<\/p>\n\n\n\n<p>Nu vor fi instituite restric\u021bii de trafic \u00een zilele premerg\u0103toare s\u0103rb\u0103torilor legale, \u00een zilele de s\u0103rb\u0103tori legale, \u00een zilele declarate ca fiind libere \u0219i duminica, excep\u021bie f\u0103c\u00e2nd interven\u021biile care nu pot fi am\u00e2nate, ce pot reprezenta un pericol asupra siguran\u021bei rutiere.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ora:&nbsp;11:15 Centrul INFOTRAFIC din Inspectoratul General al Poli\u021biei Rom\u00e2ne&nbsp;informeaz\u0103 c\u0103 \u00een perioada 17.03.2026 \u2013 15.06.2026, \u00een intervalul orar 08:00 &#8211;<\/p>\n","protected":false},"author":1,"featured_media":101639,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[54],"tags":[],"class_list":["post-134698","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-informatii-rutiere"],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2023\/08\/infotrafic-e1535778443522.jpg?fit=332%2C231&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-z2y","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/134698","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=134698"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/134698\/revisions"}],"predecessor-version":[{"id":134699,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/134698\/revisions\/134699"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/101639"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=134698"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=134698"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=134698"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}