{"id":21890,"date":"2017-05-04T12:30:33","date_gmt":"2017-05-04T09:30:33","guid":{"rendered":"http:\/\/realitatearutiera.ro\/?p=21890"},"modified":"2017-05-04T12:30:33","modified_gmt":"2017-05-04T09:30:33","slug":"circulatia-pe-podul-de-la-agigea-va-fi-restrictionata-total-in-perioada-8-25-mai","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=21890","title":{"rendered":"Circula\u021bia pe podul de la Agigea va fi restric\u021bionat\u0103 total, \u00een perioada 8 &#8211; 25 mai"},"content":{"rendered":"<p>Anun\u021bul a fost f\u0103cut, ast\u0103zi, de pre\u0219edintele Companiei Na\u021bionale de Administrare a Infrastructurii Rutiere, \u0218tefan Ioni\u021b\u0103, la Radio Rom\u00e2nia Actualit\u0103\u021bi.<\/p>\n<p>Astfel, podul de la Agigea va fi \u00eenchis total circula\u021biei rutiere p\u00e2n\u0103 pe data de 25 mai, solu\u021bia fiind luat\u0103 pentru preg\u0103tirea podului pentru fluxul imens de ma\u0219ini care \u00eel va traversa \u00een perioada sezonului estival.<\/p>\n<p><strong>&#8220;\u00cenchiderea total\u0103 a traficului pe pod este necesar\u0103 \u00een aceast\u0103 perioad\u0103 pentru tensionarea final\u0103 a cablurilor (\u00eenlocuite \u00een perioada septembrie-decembrie 2016), demontarea ancorajului provizoriu de pe pilonul central \u0219i montarea elementelor rosturilor de dilata\u021bie ale podului.<\/strong><\/p>\n<p><strong>CNAIR SA se va asigura c\u0103 \u00een perioada \u00een care Podul de la Agigea va fi \u00eenchis, Canalul Dun\u0103re-Marea Neagr\u0103 va putea fi traversat \u00een condi\u021bii optime pe noul pod (Podul Apolodor), aflat la o distan\u021b\u0103 suplimentar\u0103 de doar 2,8 km.<\/strong><\/p>\n<p><strong>Pentru evitarea blocajelor \u00een trafic, ruta alternativ\u0103 propus\u0103 este urm\u0103toarea:<\/strong><\/p>\n<p class=\"m_1534116668928777771MsoBodyText\"><strong>&#8211;\u00a0\u00a0nodul rutier A4 ( intersec\u021bie cu DN 39, Agigea) &#8211; A4 ( intrare port Constan\u021ba Sud ) &#8211; podul nou peste Canalul Dun\u0103re &#8211; Marea Neagr\u0103 &#8211; bretea acces la DN 39A- DN 39A- DN 39 (Eforie Nord &#8211; Agigea).<\/strong><\/p>\n<p class=\"m_1534116668928777771MsoBodyText\"><strong>Dup\u0103 redeschiderea podului, toate cele patru benzi vor putea fi utilizate f\u0103r\u0103 restric\u021bii de circula\u021bie, pe \u00eentreaga durat\u0103 a sezonului estival.<\/strong><\/p>\n<p class=\"m_1534116668928777771MsoBodyText\"><strong>\u00cen cazul \u00een care vremea va fi favorabil\u0103 (f\u0103r\u0103 v\u00e2nt puternic) \u0219i va permite finalizarea lucr\u0103rilor \u00eentr-un termen mai scurt,\u00a0podul de la Agigea poate fi redeschis mai devreme, iar CNAIR S.A. va aduce imediat la cunostin\u021ba publicului noua situa\u021bie.<\/strong><\/p>\n<p class=\"m_1534116668928777771MsoBodyText\"><strong>La ora actual\u0103 hidroizola\u021bia podului a fost finalizat\u0103, iar din punct de vedere tehnic toate cele patru benzi de circula\u021bie vor fi func\u021bionale, \u00eencep\u00e2nd din data de 5 mai 2017&#8243;<\/strong>, se arat\u0103 \u00eentr-un comunicat al CNAIR.<\/p>\n<p class=\"m_1534116668928777771MsoBodyText\">sursa: reporterntv.ro<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Anun\u021bul a fost f\u0103cut, ast\u0103zi, de pre\u0219edintele Companiei Na\u021bionale de Administrare a Infrastructurii Rutiere, \u0218tefan Ioni\u021b\u0103, la Radio Rom\u00e2nia Actualit\u0103\u021bi.<\/p>\n","protected":false},"author":1,"featured_media":12261,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[11],"tags":[],"class_list":["post-21890","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-stiri-interne"],"jetpack_featured_media_url":"https:\/\/i2.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2016\/08\/podagigea.jpg?fit=%2C&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-5H4","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/21890","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=21890"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/21890\/revisions"}],"predecessor-version":[{"id":21891,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/21890\/revisions\/21891"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/12261"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=21890"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=21890"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=21890"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}