{"id":34350,"date":"2018-03-30T07:53:39","date_gmt":"2018-03-30T04:53:39","guid":{"rendered":"http:\/\/realitatearutiera.ro\/?p=34350"},"modified":"2018-03-30T07:53:39","modified_gmt":"2018-03-30T04:53:39","slug":"alunecari-masive-de-teren-pe-dn-76","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=34350","title":{"rendered":"Alunec\u0103ri masive de teren pe DN 76"},"content":{"rendered":"<p>A fost \u00eenchis\u0103 circula\u0163ia rutier\u0103 pe DN 76, \u00eentre localit\u0103\u0163ile Cri\u015ftiorul de Jos \u015fi V\u00e2rfuri, pe ambele sensuri de mers, din cauza unor alunec\u0103ri de teren masive, produse pe o lungime de aproximativ 100 de metri.<\/p>\n<p>Potrivit Poli\u0163iei Bihor, traficul a fost deviat pe o rut\u0103 ocolitoare de pe DN 75: Lunca \u2013 C\u00eempani \u2013 Nucet \u2013 V\u00e2rtop \u2013 Albac.<\/p>\n<p>&#8220;Situa\u0163ia a fost adus\u0103 la cuno\u015ftin\u0163a colegilor din jude\u0163ele limitrofe. \u00cen zon\u0103 exist\u0103 echipaje ale Serviciului Rutier \u2013 Biroul Drumuri Na\u0163ionale \u015fi Europene \u015fi de la Sec\u0163iile de Poli\u0163ie Rural\u0103 \u015fi Poli\u0163iile or\u0103\u015fene\u015fti din zon\u0103&#8221;, a declarat purt\u0103torul de cuv\u00e2nt al Poli\u0163iei Bihor, comisarul Alina Dinu.<\/p>\n<p>Mai multe echipaje de la La Compania Na\u0163ional\u0103 de Administrarea a Infrastructurii Rutiere au fost trimise la fa\u0163a locului, \u00eens\u0103 condi\u0163iile meteorologice nu permit lucr\u0103ri pentru degajarea carosabilului. Calamitatea s-a produs pe \u015fantierul abandonat de firma ConstructMod \u00een luna septembrie a anului trecut.<\/p>\n<p>&#8220;Alunecarea de teren a afectat o por\u0163iune de 100 de metri a drumului, \u00een contextul ploilor abundente. A\u015ftept\u0103m ca un specialist s\u0103 ne dea o solu\u0163ie pentru c\u0103 noi (Direc\u0163ia Regional\u0103 de Drumuri nr), nu putem interveni f\u0103r\u0103 ca un proiectant s\u0103 ne dea o solu\u0163ie tehnic\u0103 pe care s\u0103 o aplic\u0103am pentru a stabiliza zona. Acum c\u0103ut\u0103m utilaje \u015fi materiale. Dup\u0103 ce va fi rezolvat\u0103 aceast\u0103 lucrare de \u00eendep\u0103rtare a p\u0103m\u00e2ntului, va trebui f\u0103cut un proiect \u00een baza c\u0103ruia s\u0103 se execute lucr\u0103ri propriu zise.<\/p>\n<p>P\u00e2n\u0103 atunci vom trevia traficul pe la Pocola &#8211; V\u00e2rfuri&#8221;, a declarat pentru ebihoreanul.ro Radu B\u0103ru\u0163a, \u015feful Direc\u0163iei Regionale de Drumuri \u015fi Poduri Cluj. Acesta nu a putut estima \u00een c\u00e2t timp se va relua circula\u0163ia. Potrivit relat\u0103rilor unor utilizatori de pe grupul Infotrafic Bihor, mai multe camioane au r\u0103mas blocate \u00een zona alunec\u0103rilor de teren.<\/p>\n<p>Sursa:adevarul.ro<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A fost \u00eenchis\u0103 circula\u0163ia rutier\u0103 pe DN 76, \u00eentre localit\u0103\u0163ile Cri\u015ftiorul de Jos \u015fi V\u00e2rfuri, pe ambele sensuri de mers,<\/p>\n","protected":false},"author":1,"featured_media":34351,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[54],"tags":[],"class_list":["post-34350","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-informatii-rutiere"],"jetpack_featured_media_url":"https:\/\/i2.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2018\/03\/646x404-21.jpg?fit=646%2C404&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-8W2","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/34350","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=34350"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/34350\/revisions"}],"predecessor-version":[{"id":34352,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/34350\/revisions\/34352"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/34351"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=34350"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=34350"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=34350"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}