{"id":3860,"date":"2015-08-07T05:42:47","date_gmt":"2015-08-07T05:42:47","guid":{"rendered":"http:\/\/realitatearutiera.ro\/?p=3860"},"modified":"2015-08-07T05:42:47","modified_gmt":"2015-08-07T05:42:47","slug":"infotrafic-azi-7-august","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=3860","title":{"rendered":"Infotrafic azi, 7 august!"},"content":{"rendered":"<p>Centrul INFOTRAFIC din Inspectoratul General al Poli\u0163iei Rom\u00e2ne informeaz\u0103 c\u0103 nu sunt semnalate probleme deosebite de fluen\u0163\u0103 a traficului rutier pe principalele artere de circula\u0163ie.<\/p>\n<p>Pe A2 Bucure\u015fti &#8211; Constan\u0163a, traficul rutier este moderat, \u00eens\u0103, \u00een jurul orei 08:00, la sta\u0163ia de taxare de la Fete\u015fti se formase o coloan\u0103 de autovehicule de aproximativ 150 de metri, pe sensul de mers c\u0103tre Constan\u0163a, pe singura band\u0103 destinat\u0103 achit\u0103rii pe loc a tarifului de trecere a podurilor \u00eentre Fete\u015fti \u015fi Cernavod\u0103. A\u015fadar, av\u00e2nd \u00een vedere c\u0103 este perioada concediilor \u0219i c\u0103 adesea, la sta\u0163ia de taxare de la Fete\u015fti, de pe A2 Bucure\u015fti &#8211; Constan\u0163a, s-au semnalat cozi la singura cas\u0103 destinat\u0103 pl\u0103\u0163ii cash a peajului (tarif de trecere a podurilor \u00eentre Fete\u015fti \u015fi Cernavod\u0103), reamintim conduc\u0103torilor auto c\u0103 prin sta\u0163ia de taxare se poate trece liber, cu obligativitatea ca taxa s\u0103 fie pl\u0103tit\u0103 \u00een avans sau ulterior, p\u00e2n\u0103 la ora 24 a zilei urm\u0103toare trecerii, la sta\u0163iile de distribu\u0163ie a carburan\u0163ilor autorizate (OMV PETROM, MOL, ROMPETROL) ori prin SMS, la num\u0103rul 7577 &#8211; num\u0103r disponibil \u00een re\u0163elele de telefonie mobil\u0103 ORANGE ROMANIA, VODAFONE ROMANIA, TELEKOM MOBILE \u015fi RCS&amp;RDS (detalii pe site-ul Companiei Na\u0163ionale de Autostr\u0103zi \u015fi Drumuri Na\u0163ionale din Rom\u00e2nia &#8211; http:\/\/www.cnadnr.ro\/pagina.php?idg=316).<\/p>\n<p>Se reaminteste\u00a0c\u0103 \u00een jude\u0163ul Giurgiu, din cauza desf\u0103\u015fur\u0103rii lucr\u0103rilor de repara\u0163ii la podul Giurgiu-Ruse, pe DN5(E85), pe sectorul cuprins \u00eentre kilometrii 63+780 \u0219i 64+852 de metri, sunt impuse restric\u0163ii de circula\u0163ie \u015fi ca urmare traficul rutier se desf\u0103\u015foar\u0103 \u00eengreunat, adesea form\u00e2ndu-se coloane de autovehicule.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Centrul INFOTRAFIC din Inspectoratul General al Poli\u0163iei Rom\u00e2ne informeaz\u0103 c\u0103 nu sunt semnalate probleme deosebite de fluen\u0163\u0103 a traficului rutier<\/p>\n","protected":false},"author":1,"featured_media":2763,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[11],"tags":[],"class_list":["post-3860","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-stiri-interne"],"jetpack_featured_media_url":"https:\/\/i2.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2015\/06\/hyy.png?fit=259%2C194&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-10g","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/3860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3860"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/3860\/revisions"}],"predecessor-version":[{"id":3861,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/3860\/revisions\/3861"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/2763"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3860"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}