{"id":50571,"date":"2019-05-31T08:44:49","date_gmt":"2019-05-31T05:44:49","guid":{"rendered":"http:\/\/realitatearutiera.ro\/?p=50571"},"modified":"2019-05-31T08:44:56","modified_gmt":"2019-05-31T05:44:56","slug":"lucrarile-pe-dn2-intre-movilita-si-cosereni-continua-traficul-se-desfasoara-alternativ-pe-ambele-sensuri","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=50571","title":{"rendered":"Lucr\u0103rile pe DN2 , \u00eentre Movili\u0163a \u015fi Co\u015fereni, continu\u0103. Traficul se desf\u0103\u015foar\u0103 alternativ pe ambele sensuri"},"content":{"rendered":"\n<p>\n\n\u00cen jude\u0163ul Ialomi\u0163a, pe DN2,\u00eentre localit\u0103\u0163ile Movili\u0163a \u015fi Co\u015fereni, continu\u0103 lucr\u0103rilei la partea carosabil\u0103 (decopertare \u015fi asfaltare), pe ambele sensuri de mers, traficul desf\u0103\u015fur\u00e2ndu-se alternativ, prin dirijarea pilo\u0163ilor de trafic.<\/p>\n\n\n\n<p>\n\nDup\u0103 finalizarea a\u015fternerii covorului asfaltic, potrivit Direc\u0163iei Regionale de Drumuri \u015fi Poduri Bucure\u015fti, circula\u0163ia rutier\u0103 pentru sectorul cuprins \u00eentre km 30+605 (ie\u015fire localitatea Sine\u015fti) p\u00e2n\u0103 la 40+240 (intrare\/ie\u015fire) localitatea Movili\u0163a, se va reglementa \u00een solu\u0163ie 2+1 (benzi de circula\u0163ie). &nbsp; Pe 8 mai au \u00eenceput lucr\u0103rile de frezare parte carosabil\u0103, \u00een vederea a\u015fternerii de covor asfaltic. Dup\u0103 finalizarea a\u015fternerii covorului asfaltic, circula\u0163ia rutier\u0103 pe DN 2, pentru sectorul cuprins \u00eentre km 30+605 (ie\u015fire localitatea Sine\u015fti) p\u00e2n\u0103 la 40+240 (intrare\/ie\u015fire) localitatea Movili\u0163a, se va reglementa \u00een solu\u0163ie 2+1 (benzi de circula\u0163ie), astfel: \u2013 Km 30+903-km 33+158 \u2013 2 benzi pe sens (Bucure\u015fti-Buz\u0103u)\/ 1 band\u0103 pe sens (Buz\u0103u-Bucure\u015fti) \u2013 Km 33+384-km 35+488 \u2013 2 benzi pe sens (Buz\u0103u-Bucure\u015fti)\/ 1 band\u0103 pe sens (Bucure\u015fti-Buz\u0103u) \u2013 Km 35+720-km 37+810 \u2013 2 benzi pe sens (Bucure\u015fti-Buz\u0103u)\/ 1 band\u0103 pe sens (Buz\u0103u-Bucure\u015fti) \u2013 Km 38+024-km 40+094 \u2013 2 benzi pe sens (Buz\u0103u-Bucure\u015fti)\/ 1 band\u0103 pe sens (Bucure\u015fti-Buz\u0103u) Marcajele rutiere \u00een strat gros se vor aplica dup\u0103 minimum 14 zile de la finalizarea lucr\u0103rii de a\u015fternere covor asfaltic.<\/p>\n\n\n\n<p>sursa: adevarul.ro<\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00cen jude\u0163ul Ialomi\u0163a, pe DN2,\u00eentre localit\u0103\u0163ile Movili\u0163a \u015fi Co\u015fereni, continu\u0103 lucr\u0103rilei la partea carosabil\u0103 (decopertare \u015fi asfaltare), pe ambele sensuri<\/p>\n","protected":false},"author":1,"featured_media":47919,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[54],"tags":[],"class_list":["post-50571","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-informatii-rutiere"],"jetpack_featured_media_url":"https:\/\/i1.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2019\/03\/drum-lucru.jpg?fit=675%2C367&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-d9F","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/50571","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=50571"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/50571\/revisions"}],"predecessor-version":[{"id":50572,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/50571\/revisions\/50572"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/47919"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=50571"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=50571"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=50571"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}