{"id":80802,"date":"2021-11-19T09:32:27","date_gmt":"2021-11-19T07:32:27","guid":{"rendered":"http:\/\/realitatearutiera.ro\/?p=80802"},"modified":"2021-11-19T09:32:32","modified_gmt":"2021-11-19T07:32:32","slug":"trafic-restrictionat-pe-autostrada-a4-pentru-efectuarea-de-lucrari","status":"publish","type":"post","link":"https:\/\/realitatearutiera.ro\/?p=80802","title":{"rendered":"TRAFIC RESTRIC\u021aIONAT PE AUTOSTRADA A4 PENTRU EFECTUAREA DE LUCR\u0102RI"},"content":{"rendered":"\n<p><strong>Centrul INFOTRAFIC din Inspectoratul General al Poli\u021biei Rom\u00e2ne&nbsp;<\/strong>informeaz\u0103 c\u0103, ast\u0103zi, 19 noiembrie, pe&nbsp;<strong>autostrada A4 Ovidiu-Agigea<\/strong>, \u00eentre Km20&nbsp; \u0219i km 21+760, pe calea 1(spre litoral), se vor aplica marcaje rutiere. Din acest motiv, traficul rutier este restric\u021bionat pe banda num\u0103rul unu, p\u00e2n\u0103 la&nbsp;<em>ora 17:00<\/em>.<\/p>\n\n\n\n<p><strong><em>Conduc\u0103torii auto sunt sf\u0103tui\u021bi s\u0103 respecte semnifica\u021bia semnaliz\u0103rii instituite temporar, circul\u00e2nd cu viteza adaptat\u0103 condi\u021biilor de trafic \u0219i s\u0103 semnalizeze din timp inten\u021bia de schimbare a benzii de circula\u021bie.<\/em><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Centrul INFOTRAFIC din Inspectoratul General al Poli\u021biei Rom\u00e2ne&nbsp;informeaz\u0103 c\u0103, ast\u0103zi, 19 noiembrie, pe&nbsp;autostrada A4 Ovidiu-Agigea, \u00eentre Km20&nbsp; \u0219i km 21+760,<\/p>\n","protected":false},"author":1,"featured_media":78510,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":"","jetpack_publicize_message":""},"categories":[54],"tags":[],"class_list":["post-80802","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-informatii-rutiere"],"jetpack_featured_media_url":"https:\/\/i2.wp.com\/realitatearutiera.ro\/wp-content\/uploads\/2021\/08\/lucrari-drum.png?fit=707%2C623&ssl=1","jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p61naM-l1g","jetpack-related-posts":[],"_links":{"self":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/80802","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=80802"}],"version-history":[{"count":1,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/80802\/revisions"}],"predecessor-version":[{"id":80803,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/posts\/80802\/revisions\/80803"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=\/wp\/v2\/media\/78510"}],"wp:attachment":[{"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=80802"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=80802"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/realitatearutiera.ro\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=80802"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}